S.No |
Nature of Work |
Value of Work
Rs. P
|
Name and Address of
Clint
|
Scheduled Period and Completion |
Date of Commencement
and Completion
|
Work Order No & Date |
-
|
Provide
service assistance for Technical service – Inspection Section for
preparation of Data Cards for Ref – III as per instructions. |
1,70,892.00 |
CPCL |
1 Year |
In Progress |
AOC No.
021/000089/06-07
dated
31.08.2006 |
-
|
Service
Assistance for Manufacturing & Technical Services at Manali Refinery of
CPCL. |
4,66,960.00 |
CPCL |
1 Year |
In Progress |
Ref: No.
011/000031/06-07
dated
05.07.2006 |
-
|
Stamping
of mass flow meters additional fee reimbursement |
2,30,000.00 |
CPCL |
2 Years |
In Progress |
AOC NO.
08/000012/06-07
dated
13.06.2006 |
-
|
Provide
technical assistance to carryout day-day maintenance in Quality control
Laboratory |
82,160.00 |
CPCL |
1 Year |
In Progress |
AOC No.
08/000009/06-07
dated
02.06.2006 |
-
|
Supply of
Structural steel, Canopies, 2” MS Pipe, Erection of panel, laying and
termination of cables. |
32,99,999.00 |
Honeywell Automation (I) Ltd., Pune. |
5 Months |
In Progress |
PO. No.
48449
date
28.03.2006
&
PO. No.
48450
Date
28.03.2006 |
-
|
Zonal
Contract – Maintenance of Instruments at Manali Refinery of CPCL |
78,06,179.00 |
CPCL |
2 Years |
In Progress |
AOC No.
011/000074/05-06
dated
20.01.2006 |
-
|
Fuel Gas
Analyzer Systems for DENOX, CPCL Site, Chennai |
4,30,000.00 |
Chemtrols Engineering Ltd.,
Goa. |
1 Month |
Completed |
W.C.No:
GG-SASX-JE75-06WC-0056 dated 11.01.2006
|
-
|
Instrumentation work at Ref-I, Ref-II, Ref-III, OPH, Co-gen, LEB/DHDS,
Analyzer, Off-site. |
2,74,297.00 |
CPCL |
2 Months |
In Progress |
AOC No.
08/000141/05-06
dated
03.02.2006 |
-
|
Cable tray
and cable laying during DHDS shutdown. |
49,993.00 |
CPCL |
1 Month |
Completed |
AOC
No. 08/000124/05-06
dated
22.12.2005 |
-
|
Instrumentation work at Ref-I, Ref-II, Ref-III, OPH, Co-gen, LEB/DHDS,
Analyzers, Off-site. |
1,88,173.00 |
CPCL |
1 Month |
Completed |
AOC
No. 08/000116/05-06
dated
06.12.2005 |
-
|
Service
Assistance for Contracts Cell. |
86,000.00 |
CPCL |
1 Year |
In Progress |
011/000036/05-06
dated
31.10.2005 |
-
|
Supply of
Earthing cable, Structural steel, Erection of panel, laying and
termination of cables. |
15,60,540.00 |
Honeywell Automation (I) Ltd., Pune. |
3 Months |
Completed |
PO. No.
40507
date
26.08.2005
&
PO. No.
40497
Date
25.08.2005 |
-
|
Old Power
House DCS/PLC Revamp Instrumentation work at CPCL. |
11,97,184.90 |
CPCL |
2 Months |
In Progress |
W.O. No.
2003-02/W/016
date
19.08.2005 |
-
|
Miscellaneous Maintenance Jobs in Offsite area, CPCL. |
90,229.50 |
CPCL |
45 days |
Completed |
AOC No.
08/000071/05-06
date
10.08.2005 |
-
|
Laying of
Telephone cables, PVC pipes, casing, fixing of Telephones. |
6,78,000.00 |
Reliance Engineering Associates Private Limited |
3 Months |
In Progress |
W.O. No.
RT8/13660274
date
02.07.2005 |
-
|
Erection
and Installation work at CPCL. |
21,490.00 |
Saab Tank Control (I) Pvt. Ltd., Pune. |
1 Month |
Completed |
WO No. SI/4151/E&C/07/180
date
29.07.2005 |
-
|
Instrumentation work Contract at RO Rejects Recovery Project at CPCL.
|
90,825.00 |
UEM INDIA LTD
New Delhi. |
2 Months |
Completed |
WO No. UEM/05-259/CPCL-45,
date 20.07.2005 |
-
|
Erection
of CCTV and Accessories at CPCL. |
1,33,800.00 |
Dataxcess Integrated Technology Ltd., Chennai.
|
1 Month |
Completed |
WO No.
CB/WO/029/
05-06/
date 01.07.2005 |
-
|
Up grading
of Instrumentation work at MRF. |
20,251.45 |
MRF/Incosoft Systems, Chennai & Arkonam |
10 days |
Completed |
|
-
|
Panel
erection works at Saint Gobain Glass India Ltd., Sriperumbudur. |
3,40,300.00 |
Yokogawa India Ltd., Bangalore. |
1 Month |
Completed |
P.O. No.
20391
Date
16.06.2005 |
-
|
Panel base
fabrication & Panel erection works at OPH, CPCL |
1,60,314.00
&
1,42,541.00 |
Honeywell Automation (I) Ltd., Pune. |
1 Month |
Completed |
PO No.
36769 / date 12.05.2005
PO No.
36770 / date 12.05.2005 |
-
|
Instrumentation work of New ZDP at CPCL, TTP Site. |
7,50,000.00
(Approxi)
|
Ion Exchange (I) Ltd., Navi, Mumbai. |
3 Months |
Completed |
LOI No.
MDS/C1020017/SR/
SGG/LOI
date 06.05.2005 |
-
|
Erection
of Instrumentation work at Power Plant CPCL. |
7,71,400.00 |
ISGEC John Thompson
Nodia (U.P.) |
2 Months |
Completed |
P.O. No.
900163/ JE1113 / date 28.04.2005 |
-
|
Laying of
Telephone cables, PVC pipes, casing, fixing of Telephones. |
10,00,000.00
|
Bharti Telenet Ltd, (Touchtel)
Chennai – 28. |
June 2003
– March 2005 |
June 2003
In Progress |
W.O No.
BTNL / TN
/ BW / 119 / 18.07.2003 |
-
|
Integration work of Shelter at Daman factory. |
2,77,704.00 |
Emerson Process Rosemount / Daman |
10 days |
Completed |
Work Order
LWO2K5-64/28/1/05 |
-
|
Analytical
Panel erection work at CPCL, Ref – II . |
28,000.00 |
Chemito Technologies, Chennai. |
10 days |
Completed |
Work Order
O/Chemito/FIME/2004
15.12.2004 |
-
|
Material
Handling and Stores Maintenance of Project Stores Jobs. |
13,32,176.00 |
CPCL / Project Stores |
AMC
Oct’ 2004
to Sep’ 2005 |
Completed |
W.O No.
Proj
(Stores)/AMC-2004-05. 30.09.2004 |
-
|
Supply of
materials for instrumentation work at TTP, CPCL |
67,909.00 |
Doshi Ion Exchange & Chemical Industries Ltd |
1 Month |
Completed |
LOI DIECIL/26/NSP/4009/
04-05.
17.11.2004. |
-
|
Instrument
installation, piping/ tubing work at TTP, CPCL |
6,00,000.00 |
Doshi Ion Exchange & Chemical Industries Ltd |
5 Months |
Completed |
Work Order
DIECIL/26/NSP/1912/04-05. 20.08.2004 |
-
|
Erection
of Panels at CPCL
Ref – III
& II |
11,22,423.00
&
2,70,160.00 |
Yokogawa India Ltd., Bangalore. |
Approxi
1 ½ Year |
Completed |
P.O No.
20128, 05.05.03
& P.O No.
202826
15.03.2004 |
-
|
Instrumentation work at Ref –I, II, III, OPH, Co-gen, LEB, DHDS,
Offsite. |
3,67,200.00 |
CPCL
|
1Year |
Completed |
AOC08/000140/04-05 07.12.2004
|
-
|
Instrument
maintenance activities during Shut-down work at CPCL. |
1,89,000.00 |
CPCL |
1 ½ Month |
Completed |
AOC08/000139/04-05 07.12.2004 |
-
|
Instrumentation work Ref-I, II, OPH, Co-gen, LEB/DHDS & Offsite. |
1,41,000.00 |
CPCL |
3 Months |
Completed |
AOC08/000118/04-05 27.09.2004 |
-
|
Instrumentation work Ref-I, II, OPH, Co-gen, LEB/DHDS & Offsite. |
1,41,000.00 |
CPCL |
3 Months |
Completed |
AOC08/000102/04-05 07.09.2004 |
-
|
Instrumentation work for DENOX facilities at Ref – III, CPCL, Chennai. |
8,19,400.50 |
M/s. A.N. Instruments Pvt. Ltd., |
4 Months |
Completed |
Work
Order. AWJ/2017/A211/B&R/CPCL/Denox19.08.04 |
-
|
Instrument
installation and piping/tubing works at CPCL – FCCU Revamp Project. |
4,11,339.60
|
M/S.Viduit and company (I) Pvt. Ltd., Mumbai. |
3 months |
Completed |
LOI 2183 (
C )/VIJ/04 13.08.04 |
-
|
Instrument
cable laying, cable glanding, cable termination etc and cable tray
installation. |
2,94,550.00 |
CPCL |
1 month |
Completed |
AOC08/000034/04-05 31.05.2004 |
-
|
Panel
Mounting with Wiring job at Chennai Metro Water pumping stations. |
57,000.00 |
Endress+Hausser Mumbai. |
4 Months |
Completed |
W.O. No.
E&H/CMWSSB/001
|
-
|
Erection
of Analytical Instruments at Ref – III |
3,92,803.00 |
Emerson Process Rosemount / CPCL |
5 Months |
Completed |
W.O No.
LWO2K3-68 / 14.08.03 & P.O No. FRIN:V90033CPCLPETRO/LP00350948/10.09.03
& . Work Order No:LWO2K5-64 / dated 28.01.05 Amendment No. 01/
dated 04.02.05 |
-
|
Daily
routine check up, preventive maintenance including trouble shooting,
rectification, reading of P & I drawings, Logic diagrams, Loop
checking, Commissioning, involving shutdown activities and supply
manpower assistant for start up works since 1991 to till date.
|
Approxi
3,60,000.00
Per Annum
(2002 –
2003)
Approxi
12,10,004.77
Per Annum
(2003 –
2004)
23,00,000.00
(2004 –
2005)
40,37,464.20
(2005 –
2006)
Approxi |
CPCL |
Regular
Maintenance works |
Completed |
|
-
|
Manpower
assistance for commissioning, startup, normal running maintenance of
instrument works of various process units. |
7,57,653.00 |
CPCL |
6 months |
Completed |
Work order
1027/W/291. 02.01.2004
Change
Order No. 1
Dated
04.08.2004. |
-
|
Up grading
of Instrumentation work at MRF. |
50,000.00
&
89,960.00 |
MRF/Incosoft Systems, Chennai & Arkonam |
2 Months
&
3 Months |
Completed |
P.O No.
1102628 |
-
|
Material
Handling and Stores Maintenance of Stores Jobs. |
15,62,280.00 |
CPCL / Stores |
AMC
July 2003
to June 2004 |
Completed |
W.O No.
660/MM(Stores)/AMC-2003
|
-
|
Terminal
Automation for bulk LPG terminal at Vaikkadu |
5,00,000.00 |
IOTL/DMC (I) Ltd., |
Approxi
6 Months |
Completed |
P.O No.
904572/16.05.2003 |
-
|
Material
Handling, Stock Verification and Maintenance of Stores. |
15,94,589.
20 |
CPCL |
June 2002
To June
2003
(13
Months) |
Completed |
W.O No:
660/MM(Stores)/AMC- 2003/30.06.2003. |
-
|
Installation of RADAR level gauges at CPCL tank Area. |
1,95,000.00 |
Saab Tank control (I) Ltd,/ CPCL |
Two
Months
|
Completed |
Work order
No: SI / 1235 / 06 / 072 Dated 23/12/2002 |
-
|
Erection
of Analytical Instruments at Ref – III
|
2,80,073.00 |
Emerson Process Rosemount / CPCL |
6 Months |
Completed |
W.O No.
LWO2K3-68 14.803. |
-
|
Service
charge for Ref-I/Co-Gen/Analyzer instrument maintenance |
30,000.00 |
CPCL |
March - 03 |
Completed |
AOC. No.
08/000243/02-03
07.03.03 |
-
|
Supply of
Rittal Panel |
60,000.00 |
CPCL |
February -
03 |
Completed |
AOC. No.
08/000234/02-03
09.02.03 |
-
|
Service
charge for Ref-I/Co-Gen/Analyzer instrument maintenance |
30,000.00 |
CPCL |
February -
03 |
Completed |
AOC. No.
08/000220/02-03
05.02.03 |
-
54
|
Auto Truck
Loading Facilities
|
1,62,445.
00 |
CPCL |
3 months
from Engineer-in-Charge intimation. |
Completed |
W.O.No.
2000-01/W026 Dt. 26.03.2002 |
-
55
|
Providing
of Truck Loading Facilities |
7,80,990.
75 |
Yokogawa India Ltd., Bangalore. |
6 months
per Work
front availability |
Completed |
Work order
No 201452/06.05.2002
|
-
|
Cable
re-routing for Radar gauges |
34,567.00 |
CPCL |
January -
03 |
Completed |
AOC. No.
08/000200/02-03
07.01.03 |
-
|
Cable
laying for Radar gauge |
44,206.00 |
CPCL |
January -
03 |
Completed |
AOC. No.
08/000198/02-03
07.01.03 |
-
|
Cable
laying for Radar gauge
|
30,407.00 |
CPCL |
December-
02 |
Completed |
AOC. No.
08/000184/02-03
31.12.02 |
-
|
Service
charge for Ref-I/Co-Gen/Analyzer instrument maintenance |
25,000.00 |
CPCL |
December-
02 |
Completed |
AOC. No.
08/000191/02-03
31.12.02 |
-
|
Service
charge for Ref-I/Co-Gen/Analyzer instrument maintenance |
25,000.00 |
CPCL |
November-
02 |
Completed |
AOC. No.
08/000162/02-03
25.11.02 |
-
|
Service
charge for LEB/Co-Gen/Analyzer instrument maintenance |
20,000.00 |
CPCL |
October -
02 |
Completed |
AOC. No.
08/000142/02-03
23.10.02 |
-
|
Service
charge for LEB/Co-Gen/Analyzer instrument maintenance |
40,000.00 |
CPCL |
October -
02 |
Completed |
AOC. No.
08/000135/02-03
21.10.02 |
-
|
Shutdown
jobs |
31,368.00 |
CPCL |
October -
02 |
Completed |
AOC. No.
08/000131/02-03
21.10.02 |
-
|
Fabrication of impulse line and control valve painting
|
24,257.00 |
CPCL |
October -
02 |
Completed |
AOC. No.
08/000125/02-03
18.10.02
|
-
|
Service
charge for assisting shutdown activities |
18,744.00 |
CPCL |
October -
02 |
Completed |
AOC. No.
08/000124/02-03
18.10.02 |
-
|
Service
charge for LEB/Co-Gen/Analyzer instrument maintenance |
40,000.00 |
CPCL |
August -
02 |
Completed |
AOC. No.
08/000110/02-03
13.09.02 |
-
|
Old cable
removing and laying at DM Plant |
25,514.00 |
CPCL |
September-02 |
Completed |
AOC. No.
08/000109/02-03
13.09.02 |
-
|
Old cable
removing and laying at PL-17 |
18,980.00 |
CPCL |
August -
02 |
Completed |
AOC. No.
08/000094/02-03
09.08.02 |
-
|
Service
charge for LEB/Co-Gen/Analyzer instrument maintenance |
26,000.00 |
CPCL |
03.07.02
to
28.07.02 |
Completed |
AOC. No.
08/000088/02-03
01.08.02 |
-
|
Service
charge for LEB/Co-Gen/Analyzer instrument maintenance |
24,000.00 |
CPCL |
03.06.02
to
28.06.02 |
Completed |
AOC. No.
08/000082/02-03
19.07.02
|
-
|
Manpower
supply for Instrument job.
|
28,000.00 |
CPCL |
01.05.02
to
31.05.02 |
Completed |
AOC. No.
08/000052/02-03
07.06.03 |
-
|
Manpower
supply for Instrument job. |
27,000.00 |
CPCL |
01.04.02
to
30.04.02 |
Completed |
AOC. No.
08/000040/02-03
24.04.03 |
-
|
Manpower
supply for Instrument job. |
35,000.
00 |
CPCL |
01.03.02
to
31.03.02 |
Completed |
AOC. No.
08/000050/01 14.03.02 |
-
|
Boiler IV
Damage cable removing and laying. |
21,064.
25 |
CPCL |
Feb’2002
10 Days |
Completed |
AOC. No.
08/000030/01
01.03.02 |
-
|
Manpower
supply for Instrument job. |
35,000.
00 |
CPCL |
01.02.02
to
28.02.02 |
Completed |
AOC. No.
08/000008/01
27.02.02 |
-
|
Manpower
supply for DCS Revamp work. |
24,491.
25 |
CPCL |
Feb’2002
10 Days |
Completed |
AOC. No.
08/000001/01
14.02.02 |
-
|
Cable tray
removal at ETP - II. |
59,400.
00 |
CPCL |
Dec’2001
to Jan’2002 |
Completed |
AOC. No.
08/00233/01
23.01.02 |
-
|
Man work
for DCS revamping including supply of panel accessories. |
51,000.
00 |
CPCL |
Jan’2002
15 Days |
Completed |
AOC. No.
08/00229/01
22.01.02 |
-
|
Supply of
Manpower for Instrument job. |
35,000.
00 |
CPCL |
01.12.01
to
31.12.01 |
Completed |
AOC. No.
08/00215/01
12.12.01 |
-
|
Fixing of
Tank Level Gauges at TK 201, 202, 204, 205 & 212. |
59,564.
00 |
CPCL |
Feb’2001
15 Days |
Completed |
AOC. No.
08/00210/01
05.12.01 |
-
|
Supply of
Manpower for Instrument job. |
35,000.
00 |
CPCL |
01.11.01
to
30.11.01 |
Completed |
AOC. No.
08/00204/01/ 23.11.01 |
-
|
Supply of
Manpower for Instrument job. |
35,000.
00 |
CPCL |
01.10.01
to
31.10.01 |
Completed |
AOC. No.
08/00186/01.31.10.01 |
-
|
CCPV
System cable laying. |
30,133.
25 |
CPCL |
Sep’2001
10 Days |
Completed |
AOC. No.
08/00158/01
11.10.01 |
-
|
DCS revamp
job - Cable work. |
30,939.
87 |
CPCL |
Oct’2001
15 Days |
Completed |
AOC. No.
08/00157/01
11.10.01 |
-
|
Removing
of old Tank Level Gauge and Relaying of cables. |
20,997.
00 |
CPCL |
Sep’2001
20 Days |
Completed |
AOC. No.
08/00144/01
24.09.01 |
-
|
Cable tray
laying at Slop Tank 808, 809, 810 & 811. |
24,745. 00 |
CPCL |
Aug’2001
20 Days |
Completed |
AOC. No.
08/00143/01
24.09.01 |
-
|
DOD, Limit
switches Servicing. |
28,103. 80 |
CPCL |
Aug’2001
10 Days |
Completed |
AOC. No.
08/00131/01
12.09.01 |
-
|
Supply of
Manpower for Instrument work. |
35,000. 00 |
CPCL |
01.09.01
to
30.09.01 |
Completed |
AOC. No.
08/00124/01 /30.08.01 |
-
|
Gas
detector work at LPG area. |
74,688.
25 |
CPCL |
Aug’2001
20 Days |
Completed |
AOC. No.
08/00119/01 23.08.01 |
-
|
Laying of
cable trays including fabrication of supports and cement pedestal with
supply of materials at ETP - II. |
1,67,580.
00 |
CPCL |
June 2001
to July 2001 |
Completed |
AOC. No.
08/00100/01 /31.07.01 |
-
|
Removing
and Relaying of cable and excavation work at ETP - II.
|
58,040. 00 |
CPCL |
June 2001
to July 2001 |
Completed |
AOC. No.
08/00099/01 /31.07/01 |
-
|
Supply of
Manpower for Instrument work. |
35,000. 00 |
CPCL |
01.08.01
to
31.08.01 |
Completed |
AOC. No.
08/00089/01 /31.07.01 |
-
|
Cable
laying removing and relaying at lube Tank area. |
48,565. 50 |
CPCL |
June 2001 |
Completed |
AOC. No.
08/00079/01 /13.07.01 |
-
|
Laying of
tray and civil foundation work at lube Tank area for Radar Tank Gauge
system. |
62,410. 00 |
CPCL |
May & June
2001 |
Completed |
AOC. No.
08/00078/01 /13.07.01 |
-
|
Gas
detector system at OM&S. |
54,646. 00 |
CPCL |
June 2001 |
Completed |
AOC. No.
08/00077/01 /13.07.01 |
-
|
Supply of
Manpower for Instrument work.
|
35,000. 00 |
CPCL |
01.07.01
to
31.07.01 |
Completed |
AOC. No.
08/00074/01 /12.07.01 |
-
|
Supply of
Manpower for Instrument work. |
35,000. 00 |
CPCL |
01.06.01
to
30.06.01 |
Completed |
AOC. No.
08/00042/01 /12.06.01 |
-
|
Gas
detector system at LEB & HEXANE. |
25,475. 00 |
CPCL |
May 2001 |
Completed |
AOC. No.
08/00040/01 /12.06.01 |
-
|
Supply of
Manpower for Instrument work. |
35,000. 00 |
CPCL |
01.05.01
to
31.05.01 |
Completed |
AOC. No.
08/00030/01 /08.05.01 |
-
|
Gas
detector at REF - I. |
40,951. 55 |
CPCL |
April &
May 2001 30 Days |
Completed |
AOC. No.
08/00034/01 /17.05.01 |
-
|
Supply of
Manpower for Instrument work. |
35,000. 00 |
CPCL |
01.04.01
to
30.04.01 |
Completed |
AOC. No.
08/00001/01 /04.04.01 |
-
|
Instrument
jobs at Plant 16 fire jobs. |
1,36,246.
00 |
CPCL |
Feb’2001 |
Completed |
AOC. No.
08/00004/01 /04.04.01 |
-
|
Gas
detector at REF - II. |
38,524. 13 |
CPCL |
Mar’2001
15 Days |
Completed |
AOC. No.
08/00005/01 /04.04.01 |
-
|
FRP Panel
fabrication and Internal accessories installed with supply of material. |
20,000. 00 |
VASS
Enterprises 16/46, Appusali st, Saligramam - 93 |
May 2001 |
Completed |
W.O.No.
VE/IMET/101
02.05.2001 |
-
|
Fabrication and Erection of gas detectors panels, cable laying and
supply and fabrication of stanchion support for gas detector. |
2,08,766.
00 |
J.B. Boda and Brothers Pvt. Ltd.,
Jain Bhavan 18/1, Andree Road |
Jan’2001
to May 2001 |
Jan’2001
to June 2001 |
W.O.No.
030/IM&E/00-01
12.03.2001
024/IM&E/00-01
10.01.2001 |
-
|
Tank gauge
(Radar) Erection work at ETP - II. |
84,150. 00 |
Toshbro
8,
Wellington Estate, 24, Commander-in-Chief Road,
Chennai -
105. |
Mar’2001
to
June 2001 |
Mar’2001
to July 2001 |
W.O.No.
E2008/E2009
31.01.2001 |
-
|
Supply of
materials for Pondicherry, MRF Instrumentation work. |
1,60,853.
00 |
Dr. Soft Engineers & Consultant P Ltd
Block 3,
Ground D
Radhakrishnan salai, Valsaravakkam, Chennai – 87.
|
Jan’2001
25 Days |
Jan’2001
to Feb’2001 |
P.O.No.
PO5/12/00-01
21.12.2000 |
-
|
Fabrication, Installation, Calibration, Loop checking and Commissioning
at MRF Pondicherry. |
41,672. 50 |
Dr. Soft Engineers & Consultant P Ltd
Block 3,
Ground D
Radhakrishnan salai, Valsaravakkam, Chennai – 87. |
Jan’2001
25 Days |
Jan’2001
to Feb’2001 |
P.O.No.
PO4/12/00-01
15.12.2000 |
-
|
Fabrication, Installation, Calibration, Loop checking and Commissioning
at MRF Hydrabed (AP). |
16,440. 00 |
Dr. Soft Engineers & Consultant P Ltd
Block 3,
Ground D
Radhakrishnan salai, Valsaravakkam, Chennai – 87. |
Dec’2000
15 Days |
01.12.2000
to 25.12.2000 |
P.O.No.
PO3/11/00-01
15.11.2000 |
-
|
Supply of
materials for Hydrabed, MRF Instrumentation work. |
18,990. 00 |
Dr. Soft Engineers & Consultant P Ltd
Block 3,
Ground D
Radhakrishnan salai, valsaravakkam, |
Dec’2000
15 Days |
01.12.2000
to 25.12.2000 |
P.O.No.
PO2/11/00-01
15.11.2000 |
-
|
Installation of stack monitoring system at Pl - 76 & 77 and Installation
of Ambient monitoring panel, Computer, Monitor and Fabrication and
Erection of panel bases including supply of material |
53,505. 94 |
Chemito Instruments Pvt.Ltd.,
1,6th
Cross street, Indira Nagar, Adyar, Chennai-20 |
July 2000
to Sep’2000 |
July 2000
to Nov’2000 |
W.O.No.
Q/TIIL/MRL/EIL/2000
18.07.2000 |
-
|
Extension
of Miscellaneous, Instrumentation, Electrical and Civil works for DHDS
Project. |
2,75,496.
00 |
CPCL |
Aug’2000
3 Months |
Aug’2000
to Nov’2000 |
W.O.No.
1026/W297
21.07.2000 |
-
|
Instrumentation work for Multigrade Bitumen Tanks. |
56,760. 00 |
CPCL |
June 1999
3 Months |
June 1999
to Aug’1999 |
W.O.No.
9510WO14/
14.06.1999 |
-
|
Instrumentation work for Additional Slop Oil Tank. |
44,515. 00 |
CPCL |
Apr’1999
3 Months |
Apr’1999
to
June 1999 |
W.O.No.
9314WO11
22.04.1999 |
-
|
Instrumentation work for Auto cutin/cutoff facility for Co-gen Plant
fire water pumps. |
4,19,100.
00 |
CPCL |
Jan’1999
2 Months |
Jan’1999
to
Jan’2000
(Job delayed due to fronts were not available and additional jobs were
included) |
W.O.No.
9305W114
18.01.1999 |
-
|
Installation of stack monitoring system at REF - II. |
1,35,270.
00 |
CPCL |
Oct’1997
1 Month |
Oct’1997
1Month
|
W.O.No.
9504W002/03.09.1997 |
-
|
Installation of Tank gauge at CPCL. |
8,040. 00 |
Endress & Hauser
Mumbai |
May 1999
1 Month |
May 1999
to
June 1999 |
P.O.No.
01/EHI/0097/00
24.05.1999 |
-
|
Laying of
UTP cable at CPCL various areas including excavation, Laying of GI pipe,
Laying of RCC work, Road cutting and Installation of Racks. |
3,03,256.
00 |
CMC Ltd.,
Seethakathi Chambers, Annasalai, Chennai |
Nov’1998 |
Job
continued whenever client asked us to do the job |
P.O.Letter
Dated 30.11.1998 |
-
|
Carryout
annual maintenance contract of Whesso Gauges and Tokyo keisso Gauges
(30 Nos)
as per instructions of Engineer-in-charge. |
41,000. 00 |
CPCL |
June 1991
to May 1992 |
June 1991
to
May 1992 |
AOC. No.
601227/91/13.06.1991 |
-
|
Carryout
maintaining of Tank Gauges (30 Nos) through Annual Maintenance contract
for one year as per the instructions. |
41,000. 00 |
CPCL |
June 1992
to May 1993 |
June 1992
to
May 1993 |
AOC. No.
602535/92/15.07.1992 |
-
|
Rectification of Installation for Tank Gauging. |
77,300. 00 |
CPCL |
Apr’1993
to
June 1993 |
Apr’1993
to
June 1993 |
AOC. No.
08/00034/1993
07.05.1993 |
-
|
Erection
of Tank Level Gauges in the Slop and Asphalt Tanks. |
19,700. 00 |
CPCL |
July 1994
10 Days |
July 1994
10 Days |
AOC. No.
08/00060/1994
11.07.1994 |
-
|
Cooling
Tower Instrumentation work. |
41,000. 00 |
Paharpur Cooling Towers Limited
Paharpur
House,
8/1/B,
Diamond Harbour Road, Calcutta - 700 027 |
Mar’1999
1 Month |
Completed
as per schedule |
Work Order
copy enclosed |
-
|
Calibration of Instruments. |
17,150. 00 |
Kirloskar Pneumatic Co. Ltd.
Hadapsar
Industrial Estate, Pune - 411 103. |
Oct’1997
15 Days |
Oct’1997
15 Days |
P.O.No.
MKTG:MDS:ACR:
PRJ:7979:
14.10.1997 |
-
|
Waste
Water Treatment plant. |
30,000. 00 |
Enviro Control Associates
Enviro
House, Ghod Dod Road, Surat - 395 001. |
Feb’1993
1 Month |
Completed
as per schedule |
Work Order
copy enclosed |