Welcome to our Site       
  Home | About us | Services | Testimony | Photo Gallery | Feedback | Contact us
 
  << Back

Services

CONCURRENT  COMMITMENT  OF  THE  BIDDER

S.No

Nature of Work

 Value of   Work
Rs. P

Name and Address of
Clint

Scheduled Period and Completion 

Date of Commencement and Completion

Work Order No & Date

  1.  

Provide service assistance for Technical service – Inspection Section for preparation of Data Cards for Ref – III as per instructions.

 

 

1,70,892.00

 

 

CPCL

 

 

1 Year

 

 

In Progress

 

AOC No.   

021/000089/06-07

dated 31.08.2006

  1.  

Service Assistance for Manufacturing & Technical Services at Manali Refinery of CPCL.

 

4,66,960.00

 

CPCL

 

1 Year

 

In Progress

 

Ref: No.

011/000031/06-07

dated 05.07.2006

  1.  

Stamping of mass flow meters additional fee reimbursement

 

2,30,000.00

 

CPCL

 

2 Years

 

In Progress

AOC NO.

08/000012/06-07

dated 13.06.2006

  1.  

Provide technical assistance to carryout day-day maintenance  in Quality control Laboratory

 

82,160.00

 

CPCL

 

1 Year

 

In Progress

AOC No.

08/000009/06-07

dated 02.06.2006

  1.  

Supply of Structural steel, Canopies,  2” MS Pipe,  Erection of panel, laying and termination of cables.

 

32,99,999.00

Honeywell Automation (I) Ltd., Pune.

 

5 Months

 

In Progress

PO. No. 48449

date 28.03.2006

&

PO. No. 48450

Date 28.03.2006

  1.  

Zonal Contract – Maintenance of Instruments at Manali Refinery of CPCL

78,06,179.00

CPCL

2 Years

In Progress

AOC No.

011/000074/05-06

dated 20.01.2006

  1.  

Fuel Gas Analyzer Systems for DENOX,  CPCL Site, Chennai

4,30,000.00

Chemtrols Engineering Ltd.,

Goa.

1 Month

Completed

W.C.No:

GG-SASX-JE75-06WC-0056 dated 11.01.2006

 

 

  1.  

Instrumentation work at Ref-I, Ref-II, Ref-III, OPH, Co-gen, LEB/DHDS, Analyzer, Off-site.

 

2,74,297.00

 

CPCL

 

2 Months

 

In Progress

AOC No.

08/000141/05-06

dated 03.02.2006

  1.  

Cable tray and cable laying during DHDS shutdown.

49,993.00

CPCL

1 Month

Completed

AOC No.         08/000124/05-06

dated 22.12.2005

  1.  

Instrumentation work at Ref-I, Ref-II, Ref-III, OPH, Co-gen, LEB/DHDS, Analyzers, Off-site.

1,88,173.00

CPCL

1 Month

Completed

AOC No.                       08/000116/05-06

dated 06.12.2005

  1.  

Service Assistance for Contracts Cell.

86,000.00

CPCL

1 Year

In Progress

011/000036/05-06

dated 31.10.2005

  1.  

Supply of Earthing cable, Structural steel, Erection of panel, laying and termination of cables.

 

15,60,540.00

Honeywell Automation (I) Ltd., Pune.

 

3 Months

 

Completed

PO. No. 40507

date 26.08.2005

&

PO. No. 40497

Date 25.08.2005

  1.  

Old Power House DCS/PLC Revamp Instrumentation work at CPCL.

11,97,184.90

CPCL

2 Months

In Progress

W.O. No. 2003-02/W/016

date 19.08.2005

  1.  

Miscellaneous Maintenance Jobs in Offsite area, CPCL.

90,229.50

CPCL

45 days

Completed

AOC No.

08/000071/05-06

date 10.08.2005

  1.  

Laying of Telephone cables, PVC pipes, casing, fixing of Telephones.

6,78,000.00

Reliance Engineering Associates Private Limited

3 Months

In Progress

W.O. No. RT8/13660274

date 02.07.2005

  1.  

Erection and Installation work at CPCL.

21,490.00

Saab Tank Control (I) Pvt. Ltd., Pune.

 

1 Month

 

Completed

WO No. SI/4151/E&C/07/180

date 29.07.2005

  1.  

Instrumentation work Contract at RO Rejects Recovery Project at CPCL.

90,825.00

UEM INDIA LTD

New Delhi.

2 Months

Completed

WO No. UEM/05-259/CPCL-45, date 20.07.2005

  1.  

Erection  of CCTV and Accessories at CPCL.

 

1,33,800.00

Dataxcess Integrated Technology Ltd., Chennai.

 

 

1 Month

 

Completed

 

WO No. CB/WO/029/

05-06/ date 01.07.2005

  1.  

Up grading of Instrumentation work at MRF.

20,251.45

MRF/Incosoft Systems, Chennai & Arkonam

10 days

Completed

 

  1.  

Panel erection works at Saint Gobain Glass India Ltd., Sriperumbudur.

3,40,300.00

Yokogawa India Ltd., Bangalore.

1 Month

Completed

P.O. No. 20391

Date 16.06.2005

  1.  

Panel base fabrication & Panel erection works at OPH, CPCL

1,60,314.00

&

1,42,541.00

Honeywell Automation (I) Ltd., Pune.

 

1 Month

 

Completed

PO No. 36769 / date 12.05.2005 

PO No. 36770 / date 12.05.2005

  1.  

Instrumentation work of New ZDP at CPCL, TTP Site.

7,50,000.00

(Approxi)

 

Ion Exchange (I) Ltd., Navi, Mumbai.

3 Months

Completed

LOI No. MDS/C1020017/SR/

SGG/LOI date 06.05.2005

  1.  

Erection of Instrumentation work at Power Plant CPCL.

7,71,400.00

ISGEC John Thompson 

Nodia (U.P.)

2 Months

Completed

P.O. No. 900163/ JE1113 / date 28.04.2005

  1.  

Laying of Telephone cables, PVC pipes, casing, fixing of Telephones.

10,00,000.00

 

Bharti Telenet Ltd, (Touchtel)

Chennai – 28.

June 2003 – March 2005

June 2003

In Progress

W.O No.

BTNL / TN / BW / 119 / 18.07.2003

  1.  

Integration work of Shelter at Daman factory.

2,77,704.00

Emerson Process Rosemount / Daman

10 days

Completed

Work Order

LWO2K5-64/28/1/05

  1.  

Analytical Panel erection work at CPCL, Ref – II .

28,000.00

Chemito Technologies, Chennai.

10 days

Completed

Work Order

O/Chemito/FIME/2004

15.12.2004

  1.  

Material Handling and Stores Maintenance of Project Stores Jobs.

13,32,176.00

CPCL / Project Stores

AMC

Oct’ 2004 to Sep’ 2005

Completed

W.O No.

Proj (Stores)/AMC-2004-05. 30.09.2004

  1.  

Supply of materials for instrumentation work at TTP, CPCL

67,909.00

Doshi Ion Exchange & Chemical Industries Ltd

1 Month

Completed

LOI DIECIL/26/NSP/4009/

04-05. 17.11.2004.

  1.  

Instrument installation, piping/ tubing work at TTP, CPCL

6,00,000.00

Doshi Ion Exchange & Chemical Industries Ltd

5 Months

Completed

Work Order DIECIL/26/NSP/1912/04-05. 20.08.2004

  1.  

Erection of Panels at CPCL

Ref – III & II

11,22,423.00

&

2,70,160.00

Yokogawa India Ltd., Bangalore.

Approxi

1 ½ Year

Completed

P.O No. 20128,  05.05.03

& P.O No. 202826

15.03.2004

  1.  

Instrumentation work at Ref –I, II, III, OPH, Co-gen, LEB, DHDS, Offsite.

3,67,200.00

CPCL

 

 

1Year

Completed

AOC08/000140/04-05 07.12.2004

 

  1.  

Instrument maintenance activities during Shut-down work at CPCL.

1,89,000.00

CPCL

1 ½ Month

Completed

AOC08/000139/04-05  07.12.2004

  1.  

Instrumentation work Ref-I, II, OPH, Co-gen, LEB/DHDS & Offsite.

1,41,000.00

CPCL

3 Months

Completed

AOC08/000118/04-05 27.09.2004

  1.  

Instrumentation work Ref-I, II, OPH, Co-gen, LEB/DHDS & Offsite.

1,41,000.00

CPCL

3 Months

Completed

AOC08/000102/04-05 07.09.2004

  1.  

Instrumentation work for DENOX facilities at Ref – III, CPCL, Chennai.

8,19,400.50

M/s. A.N. Instruments Pvt. Ltd.,

4 Months

Completed

Work Order. AWJ/2017/A211/B&R/CPCL/Denox19.08.04

  1.  

Instrument installation and piping/tubing works at CPCL – FCCU Revamp Project.

4,11,339.60

 

M/S.Viduit and company (I) Pvt. Ltd., Mumbai.

3 months

Completed

LOI 2183 ( C )/VIJ/04 13.08.04

  1.  

Instrument cable laying, cable glanding, cable termination etc and cable tray installation.

2,94,550.00

CPCL

1 month

Completed

AOC08/000034/04-05 31.05.2004

  1.  

Panel Mounting with Wiring job at Chennai Metro Water pumping stations.

57,000.00

Endress+Hausser Mumbai.

4 Months

Completed

W.O. No. E&H/CMWSSB/001

 

  1.  

Erection of Analytical Instruments at Ref – III

3,92,803.00

Emerson Process Rosemount / CPCL

5 Months

Completed

W.O No. LWO2K3-68 / 14.08.03 &  P.O No. FRIN:V90033CPCLPETRO/LP00350948/10.09.03 & .  Work Order No:LWO2K5-64 / dated 28.01.05          Amendment No. 01/ dated 04.02.05

  1.  

Daily routine check up, preventive maintenance including trouble shooting, rectification, reading of P & I drawings,  Logic diagrams, Loop checking, Commissioning, involving shutdown activities and supply manpower assistant for start up works since 1991 to till date.

Approxi

3,60,000.00

Per Annum

(2002 – 2003)

Approxi

12,10,004.77

Per Annum

(2003 – 2004)

23,00,000.00

(2004 – 2005)

40,37,464.20

(2005 – 2006)

Approxi

CPCL

Regular Maintenance works

Completed

 

  1.  

Manpower assistance for commissioning, startup, normal running maintenance of instrument works of various process units.

7,57,653.00

CPCL

6 months

Completed

Work order 1027/W/291. 02.01.2004

Change Order No. 1

Dated 04.08.2004.

  1.  

Up grading of Instrumentation work at MRF.

50,000.00 

&     

89,960.00

MRF/Incosoft Systems, Chennai & Arkonam

2 Months

&

3 Months

Completed

 

P.O No. 1102628

  1.  

Material Handling and Stores Maintenance of Stores Jobs.

15,62,280.00

CPCL / Stores

AMC

July 2003 to June 2004

Completed

W.O No. 660/MM(Stores)/AMC-2003

 

  1.  

Terminal Automation for bulk LPG terminal at Vaikkadu

5,00,000.00

IOTL/DMC (I) Ltd.,

Approxi

6 Months

Completed

P.O No. 904572/16.05.2003

  1.  

Material Handling, Stock Verification and Maintenance of Stores.

15,94,589. 20

CPCL

June 2002

To June 2003

(13 Months)

Completed

W.O No: 660/MM(Stores)/AMC- 2003/30.06.2003.

  1.  

Installation of RADAR level gauges at CPCL tank Area.

1,95,000.00

Saab Tank control (I) Ltd,/ CPCL

 Two Months

 

Completed

Work order No:             SI / 1235 / 06 / 072 Dated 23/12/2002

  1.  

Erection of Analytical Instruments at Ref – III

 

2,80,073.00

Emerson Process Rosemount / CPCL

6 Months

Completed

W.O No. LWO2K3-68 14.803.

  1.  

Service charge for Ref-I/Co-Gen/Analyzer instrument maintenance

30,000.00

CPCL

March - 03

Completed

AOC. No.

08/000243/02-03

07.03.03

  1.  

Supply of Rittal Panel

60,000.00

CPCL

February - 03

Completed

AOC. No.

08/000234/02-03

09.02.03

  1.  

Service charge for Ref-I/Co-Gen/Analyzer instrument maintenance

30,000.00

CPCL

February - 03

Completed

AOC. No.

08/000220/02-03

05.02.03

  1. 54

Auto Truck Loading Facilities

 

1,62,445. 00

CPCL

3 months from Engineer-in-Charge intimation.

Completed

W.O.No. 2000-01/W026 Dt. 26.03.2002

  1. 55

Providing of Truck Loading Facilities

7,80,990. 75

Yokogawa India Ltd., Bangalore.

6 months

per Work front availability

Completed

Work order No 201452/06.05.2002

 

  1.  

Cable re-routing for Radar gauges

34,567.00

CPCL

January - 03

Completed

AOC. No.

08/000200/02-03

07.01.03

  1.  

Cable laying for Radar gauge

44,206.00

CPCL

January - 03

Completed

AOC. No.

08/000198/02-03

07.01.03

  1.  

Cable laying for Radar gauge

 

30,407.00

CPCL

December- 02

Completed

AOC. No.

08/000184/02-03

31.12.02

  1.  

Service charge for Ref-I/Co-Gen/Analyzer instrument maintenance

25,000.00

CPCL

December- 02

Completed

AOC. No.

08/000191/02-03

31.12.02

  1.  

Service charge for Ref-I/Co-Gen/Analyzer instrument maintenance

25,000.00

CPCL

November- 02

Completed

AOC. No.

08/000162/02-03

25.11.02

  1.  

Service charge for LEB/Co-Gen/Analyzer instrument maintenance

20,000.00

CPCL

October - 02

Completed

AOC. No.

08/000142/02-03

23.10.02

  1.  

Service charge for LEB/Co-Gen/Analyzer instrument maintenance

40,000.00

CPCL

October - 02

Completed

AOC. No.

08/000135/02-03

21.10.02

  1.  

Shutdown jobs

31,368.00

CPCL

October - 02

Completed

AOC. No.

08/000131/02-03

21.10.02

  1.  

Fabrication of impulse line and control valve painting

 

24,257.00

CPCL

October - 02

Completed

AOC. No.

08/000125/02-03

18.10.02

 

  1.  

Service charge for assisting shutdown activities 

18,744.00

CPCL

October - 02

Completed

AOC. No.

08/000124/02-03

18.10.02

  1.  

Service charge for LEB/Co-Gen/Analyzer instrument maintenance

40,000.00

CPCL

August - 02

Completed

AOC. No.

08/000110/02-03

13.09.02

  1.  

Old cable removing and laying at DM Plant

25,514.00

CPCL

September-02

Completed

AOC. No.

08/000109/02-03

13.09.02

  1.  

Old cable removing and laying at PL-17

18,980.00

CPCL

August - 02

Completed

AOC. No.

08/000094/02-03

09.08.02

  1.  

Service charge for LEB/Co-Gen/Analyzer instrument maintenance

26,000.00

CPCL

03.07.02 to

28.07.02

Completed

AOC. No.

08/000088/02-03

01.08.02

  1.  

Service charge for LEB/Co-Gen/Analyzer instrument maintenance

24,000.00

CPCL

03.06.02 to

28.06.02

Completed

AOC. No.

08/000082/02-03

19.07.02

 

  1.  

Manpower supply for Instrument job.

 

28,000.00

CPCL

01.05.02 to

31.05.02

Completed

AOC. No.

08/000052/02-03

07.06.03

  1.  

Manpower supply for Instrument job.

   27,000.00

CPCL

01.04.02 to

30.04.02

Completed

AOC. No.

08/000040/02-03

24.04.03

  1.  

Manpower supply for Instrument job.

   35,000. 00

CPCL

01.03.02 to

31.03.02

Completed

AOC. No.

08/000050/01 14.03.02

  1.  

Boiler IV Damage cable removing and laying.

   21,064. 25

CPCL

Feb’2002

10 Days

Completed

AOC. No.

08/000030/01

01.03.02

  1.  

Manpower supply for Instrument job.

   35,000. 00

CPCL

01.02.02 to

28.02.02

Completed

AOC. No.

08/000008/01

27.02.02

  1.  

Manpower supply for DCS Revamp work.

   24,491. 25

CPCL

Feb’2002

10 Days

Completed

AOC. No.

08/000001/01

14.02.02

  1.  

Cable tray removal at ETP - II.

   59,400. 00

CPCL

Dec’2001 to Jan’2002

Completed

AOC. No.

08/00233/01

23.01.02

  1.  

Man work for DCS revamping including supply of panel accessories.

   51,000. 00

CPCL

Jan’2002

15 Days

Completed

AOC. No.

08/00229/01

22.01.02

  1.  

Supply of Manpower for Instrument job.

   35,000. 00

CPCL

01.12.01 to

31.12.01

Completed

AOC. No.

08/00215/01

12.12.01

  1.  

Fixing of Tank Level Gauges at TK 201, 202, 204, 205 & 212.

   59,564. 00

CPCL

Feb’2001

15 Days

Completed

AOC. No.

08/00210/01

05.12.01

  1.  

Supply of Manpower for Instrument job.

   35,000. 00

CPCL

01.11.01 to

30.11.01

Completed

AOC. No.

08/00204/01/ 23.11.01

  1.  

Supply of Manpower for Instrument job.

   35,000. 00

CPCL

01.10.01 to

31.10.01

Completed

AOC. No.

08/00186/01.31.10.01

  1.  

CCPV System cable laying.

   30,133. 25

CPCL

Sep’2001

10 Days

Completed

AOC. No.

08/00158/01

11.10.01

  1.  

DCS revamp job - Cable work.

   30,939. 87

CPCL

Oct’2001

15 Days

Completed

AOC. No.

08/00157/01

11.10.01

  1.  

Removing of old Tank Level Gauge and Relaying of cables.

   20,997. 00

CPCL

Sep’2001

20 Days

Completed

AOC. No.

08/00144/01

24.09.01

  1.  

Cable tray laying at Slop Tank 808, 809, 810 & 811.

24,745. 00

CPCL

Aug’2001

20 Days

Completed

AOC. No.

08/00143/01

24.09.01

  1.  

DOD, Limit switches Servicing.

28,103. 80

CPCL

Aug’2001

10 Days

Completed

AOC. No.

08/00131/01

12.09.01

  1.  

Supply of Manpower for Instrument work.

35,000. 00

CPCL

01.09.01 to

30.09.01

Completed

AOC. No.

08/00124/01 /30.08.01

  1.  

Gas detector work at LPG area.

   74,688. 25

CPCL

Aug’2001

20 Days

Completed

AOC. No.

08/00119/01  23.08.01

  1.  

Laying of cable trays including fabrication of supports and cement pedestal with supply of materials at ETP - II.

1,67,580. 00

CPCL

June 2001 to July 2001

Completed

AOC. No.

08/00100/01 /31.07.01

  1.  

Removing and Relaying of cable and excavation work at ETP - II.

 

58,040. 00

CPCL

June 2001 to July 2001

Completed

AOC. No.

08/00099/01 /31.07/01

  1.  

Supply of Manpower for Instrument work.

35,000. 00

CPCL

01.08.01 to

31.08.01

Completed

AOC. No.

08/00089/01 /31.07.01

  1.  

Cable laying removing and relaying at lube Tank area.

48,565. 50

CPCL

June 2001

Completed

AOC. No.

08/00079/01 /13.07.01

  1.  

Laying of tray and civil foundation work at lube Tank area for Radar Tank Gauge system.

62,410. 00

CPCL

May & June 2001

Completed

AOC. No.

08/00078/01 /13.07.01

  1.  

Gas detector system at OM&S.

54,646. 00

CPCL

June 2001

Completed

AOC. No.

08/00077/01 /13.07.01

  1.  

Supply of Manpower for Instrument work.

 

35,000. 00

CPCL

01.07.01 to

31.07.01

Completed

AOC. No.

08/00074/01 /12.07.01

  1.  

Supply of Manpower for Instrument work.

35,000. 00

CPCL

01.06.01 to

30.06.01

Completed

AOC. No.

08/00042/01 /12.06.01

  1.  

Gas detector system at LEB & HEXANE.

25,475. 00

CPCL

May 2001

Completed

AOC. No.

08/00040/01 /12.06.01

  1.  

Supply of Manpower for Instrument work.

35,000. 00

CPCL

01.05.01 to

31.05.01

Completed

AOC. No.

08/00030/01 /08.05.01

  1.  

Gas detector at REF - I.

40,951. 55

CPCL

April & May     2001 30 Days

Completed

AOC. No.

08/00034/01 /17.05.01

  1.  

Supply of Manpower for Instrument work.

35,000. 00

CPCL

01.04.01 to

30.04.01

Completed

AOC. No.

08/00001/01 /04.04.01

  1.  

Instrument jobs at Plant 16 fire jobs. 

1,36,246. 00

CPCL

Feb’2001

Completed

AOC. No.

08/00004/01 /04.04.01

  1.  

Gas detector at REF - II.

38,524. 13

CPCL

Mar’2001

15 Days

Completed

AOC. No.

08/00005/01 /04.04.01

  1.  

FRP Panel fabrication and Internal accessories installed with supply of material.

20,000. 00

VASS Enterprises 16/46, Appusali st, Saligramam  - 93

May 2001

Completed

W.O.No.

VE/IMET/101

02.05.2001

  1.  

Fabrication and Erection of gas detectors panels, cable laying and supply and fabrication of stanchion support for gas detector.

2,08,766. 00

J.B. Boda and Brothers Pvt. Ltd.,

Jain Bhavan 18/1, Andree Road

Jan’2001 to May 2001

Jan’2001 to June 2001

W.O.No.

030/IM&E/00-01

12.03.2001

024/IM&E/00-01

10.01.2001

  1.  

Tank gauge (Radar) Erection work at ETP - II.

84,150. 00

Toshbro

8, Wellington Estate, 24, Commander-in-Chief Road,

Chennai - 105.

Mar’2001 to

June 2001

Mar’2001 to July 2001

W.O.No.

E2008/E2009

31.01.2001

  1.  

Supply of materials for Pondicherry, MRF Instrumentation work.

1,60,853. 00

Dr. Soft Engineers  & Consultant  P Ltd

Block 3, Ground D

Radhakrishnan salai, Valsaravakkam, Chennai – 87.

 

Jan’2001

25 Days

Jan’2001 to Feb’2001

P.O.No.

PO5/12/00-01

21.12.2000

  1.  

Fabrication, Installation, Calibration, Loop checking and Commissioning at MRF Pondicherry.

41,672. 50

Dr. Soft Engineers  & Consultant P Ltd

Block 3, Ground D

Radhakrishnan salai, Valsaravakkam, Chennai – 87.

Jan’2001

25 Days

Jan’2001 to Feb’2001

P.O.No.

PO4/12/00-01

15.12.2000

  1.  

Fabrication, Installation, Calibration, Loop checking and Commissioning at MRF Hydrabed (AP).

16,440. 00

Dr. Soft Engineers  & Consultant P Ltd

Block 3, Ground D

Radhakrishnan salai, Valsaravakkam, Chennai – 87.

Dec’2000

15 Days

01.12.2000 to 25.12.2000

P.O.No.

PO3/11/00-01

15.11.2000

  1.  

Supply of materials for Hydrabed, MRF Instrumentation work.

18,990. 00

Dr. Soft Engineers  & Consultant P Ltd

Block 3, Ground D

Radhakrishnan salai, valsaravakkam,

Dec’2000

15 Days

01.12.2000 to 25.12.2000

P.O.No.

PO2/11/00-01

15.11.2000

  1.  

Installation of stack monitoring system at Pl - 76 & 77 and Installation of Ambient monitoring panel, Computer, Monitor and Fabrication and Erection of panel bases including supply of material

53,505. 94

Chemito Instruments Pvt.Ltd.,

1,6th Cross street, Indira Nagar, Adyar, Chennai-20

July 2000 to Sep’2000

July 2000 to Nov’2000

W.O.No.

Q/TIIL/MRL/EIL/2000

18.07.2000

  1.  

Extension of Miscellaneous, Instrumentation, Electrical and Civil works for DHDS Project.

2,75,496. 00

CPCL

Aug’2000

3 Months

Aug’2000 to Nov’2000

W.O.No.

1026/W297

21.07.2000

  1.  

Instrumentation work for Multigrade Bitumen Tanks.

56,760. 00

CPCL

June 1999

3 Months

June 1999 to Aug’1999

W.O.No.

9510WO14/

14.06.1999

  1.  

Instrumentation work for Additional Slop Oil Tank.

44,515. 00

CPCL

Apr’1999

3 Months

Apr’1999 to

June 1999

W.O.No.

9314WO11

22.04.1999

  1.  

Instrumentation work for Auto cutin/cutoff facility for Co-gen Plant fire water pumps.

4,19,100. 00

CPCL

Jan’1999

2 Months

Jan’1999 to

Jan’2000 (Job delayed due to fronts were not available and additional jobs were included)

W.O.No.

9305W114

18.01.1999

  1.  

Installation of stack monitoring system at REF - II.

1,35,270. 00

CPCL

Oct’1997

1 Month

Oct’1997 1Month

 

W.O.No.

9504W002/03.09.1997

  1.  

Installation of Tank gauge at CPCL.

8,040. 00

Endress & Hauser

Mumbai

May 1999

1 Month

May 1999 to

June 1999

P.O.No. 01/EHI/0097/00

24.05.1999

  1.  

Laying of UTP cable at CPCL various areas including excavation, Laying of GI pipe, Laying of RCC work, Road cutting and Installation of Racks.

3,03,256. 00

CMC Ltd.,

Seethakathi Chambers, Annasalai, Chennai

Nov’1998

Job continued whenever client asked us to do the job

P.O.Letter Dated 30.11.1998

  1.  

Carryout annual maintenance contract of Whesso Gauges and Tokyo keisso Gauges

(30 Nos) as per instructions of Engineer-in-charge. 

41,000. 00

CPCL

June 1991 to May 1992

June 1991 to

May 1992

AOC. No.

601227/91/13.06.1991

  1.  

Carryout maintaining of Tank Gauges (30 Nos) through Annual Maintenance contract for one year as per the instructions.

41,000. 00

CPCL

June 1992 to May 1993

June 1992 to

May 1993

AOC. No.

602535/92/15.07.1992

  1.  

Rectification of Installation for Tank Gauging.

77,300. 00

CPCL

Apr’1993 to

June 1993

Apr’1993 to

June 1993

AOC. No.

08/00034/1993

07.05.1993

  1.  

Erection of Tank Level Gauges in the Slop and Asphalt Tanks.

19,700. 00

CPCL

July 1994

10 Days

July 1994

10 Days

AOC. No.

08/00060/1994

11.07.1994

  1.  

Cooling Tower Instrumentation work.

41,000. 00

Paharpur Cooling Towers Limited

Paharpur House,

8/1/B, Diamond Harbour Road, Calcutta - 700 027

Mar’1999

1 Month

Completed as per schedule

Work Order copy enclosed

  1.  

Calibration of Instruments.

17,150. 00

Kirloskar Pneumatic Co. Ltd.

Hadapsar Industrial Estate, Pune - 411 103.

Oct’1997

15 Days

Oct’1997

15 Days

P.O.No.

MKTG:MDS:ACR:

PRJ:7979: 14.10.1997

  1.  

Waste Water Treatment plant.

30,000. 00

Enviro Control Associates

Enviro House, Ghod Dod Road, Surat - 395 001.

Feb’1993

1 Month

Completed as per schedule

Work Order copy enclosed

 

STATUTORY
STATUTORY REGISTRATION DETAILS
Company Regn - U74210TN2004PTC053067
SSI - 33/01/13736/20.09.93 (Permanent)
TNGST NO - 1083645/2004-05
CST NO - 819949/14.06.2004
AREA CODE NO - 055
INCOME TAX PAN - AAACF8040J
TAN NO - CHEF03242B
SERVICE TAX -

REGD.NO:MRS/DIVISION-I/218/STC  CAI/DIVISION-I/056/STC

Labour Licence No - L/174/2006 dated 06.07.2006
EPF CODE NO - TN/48735/2000
ESI NO -

51/55341/101/2000

 


 
 
 
Contact
 
  Tel:
  +91 44 25585363 /
  +91 44 25589541
 
  E-mail:
  info@franklininstruments.in /
  frankinst@eth.net
 
 
  Copyright2006@Franklin Instrument Maintenance and Erection Techs Pvt. Ltd., ||| Powered By Kuber Info Soft, Chennai.
https://www.luxbaga.de/Louis-Vuitton-Monogram-Canvas-Envelop-Rosalie-Coin-Purse-M62361-Yellow4119 https://www.luxbaga.de/Hermes-Picotin-Lock-76z3xNXC https://www.luxbaga.de/Louis-Vuitton-Men039s-Messenger-Monogram-Outdoor-Bag-M43829-Pacific-2018644 https://www.luxbaga.de/Chloe-Pixie-bag-VdMOLx3t https://www.luxbaga.de/Lady-Dior-Awryi7LV https://www.luxbaga.de/Goyard-Saint-Louis-GM-Tote-Bag-PEDpfeR5 https://www.luxbaga.de/Louis-Vuitton-M56245-LV-Key-Pouch-in-Black-Epi-leather3421 https://www.luxbaga.de/Louis-Vuitton-Monogram-Empreinte-Compact-Curieuse-Wallet-Black4163 https://www.luxbaga.de/Louis-Vuitton-Capucines-BB-Bag-Python-Handle-N92041-Galet214 https://www.luxbaga.de/Michael-Kors-Mercer-Love-Leather-Tote-Grey67 https://www.luxbaga.de/Louis-Vuitton-Lockme-Backpack-Bag-M41817-Denim-Blue-20182393 https://www.luxbaga.de/Prada-paradigme-FO1SdsSj https://www.luxbaga.de/Louis-Vuitton-Chantilly-Lock-Shoulder-Bag-M43645-Pink-2018543 https://www.luxbaga.de/Louis-Vuitton-N41425-Damier-Ebene-Coated-Canvas-Duomo-Bags1705 https://www.luxbaga.de/Burberry-Wallet-S20RhRMs https://www.luxbaga.de/Louis-Vuitton-M9677-LV-Neo-Inventeur-Reversible-35mm-Belts-Damier-Ebene-Canvas-Gold-Buckle4762 https://www.luxbaga.de/Louis-Vuitton-Monogram-Empreinte-Sarah-Wallet-Rosy4162 https://www.luxbaga.de/Louis-Vuitton-M52510-LV-Twist-MM-Epi-Leather-Bags-Black2147 https://www.luxbaga.de/VALENTINO-Shopping-Bag-m9IXRu3i https://www.luxbaga.de/Louis-Vuitton-N60091-LV-Brazza-Wallet-Damier-Graphite-Canvas4191 https://www.luxbaga.de/YSL-High-Heels-1i3eQ9rJ https://www.luxbaga.de/Hermes-Birkin-30-p6mp1Cc8 https://www.luxbaga.de/Louis-Vuitton-Monogram-Vernis-Montana-bag-M90057-violet87 https://www.luxbaga.de/Celine-Luggage-Nano-Bag-ywSV6FTa https://www.luxbaga.de/Louis-Vuitton-Alma-BB--Epi-Leather-M91606-Hot-Pink(KD-721603)118 https://www.luxbaga.de/Louis-Vuitton-Summer-Trunks-Damier-Azur-Canvas-Chain-Pochette-Weekend-Clutch-Bag-N60108-20181517 https://www.luxbaga.de/Louis-Vuitton-M55017-Lockme-Backpack-Mini-Soft-Calfskin-Bleu-Jean421 https://www.luxbaga.de/Louis-Vuitton-Monogram-100x200cm-Cashmere-Scarf-And-Shawl2484 https://www.luxbaga.de/Louis-Vuitton-Monogram-Canvas-Daily-Organise-M60699-Black4095 https://www.luxbaga.de/DIOR-Clutch-Bags-WE9ZhCs6 https://www.luxbaga.de/Louis-Vuitton-M52805-LV-Epi-Leather-SAC-Tricot-Bags-Yellow2144 https://www.luxbaga.de/Fendi-peekaboo-ygFMwGCa https://www.luxbaga.de/Balenciaga-Classic-city-S-hSd8UIEH https://www.luxbaga.de/Louis-Vuitton-Monogram-Vernis-Pasadena-Bag-Pink-20162788 https://www.luxbaga.de/LOUIS-VUITTON-SARAH-WALLET-M64488-20174390 https://www.luxbaga.de/Louis-Vuitton-Lockme-Cabas-Tote-M55028-Black-20182395 https://www.luxbaga.de/Louis-Vuitton-OnTheGo-MM-Bag-In-Raffia-With-Blue-Leather-M57723327 https://www.luxbaga.de/Lady-Dior-ZNZHYSB0 https://www.luxbaga.de/Celine-Box-Bag-XvVutaPq https://www.luxbaga.de/Louis-Vuitton-City-Trunks--40669-shoulder-bag(2)(1c018-71303)540 https://www.luxbaga.de/LOUIS-VUITTON-CHRISTOPHER-MESSENGER-Damier-Graphite-Canvas-N415001770 https://www.luxbaga.de/Hermes-Jypsiere-Po4Wec7W https://www.luxbaga.de/Valentino-shoulder-bag-XpGyH7SH https://www.luxbaga.de/Louis-Vuitton-Men039s-Oliver-Briefcase-in-Epi-Leather-M51690-Blue-Marine-20182313 https://www.luxbaga.de/YSL-MONOGRAM-KATE-uNpv8d8U https://www.luxbaga.de/Balenciaga-Jacket-cQuj6lzP https://www.luxbaga.de/Chloe-Faye-Backpack-lWcjggXP https://www.luxbaga.de/Louis-Vuitton-M64411-LV-Passport-Cover-Wallet-Monogram-canvas3841 https://www.luxbaga.de/Lady-Dior-9MBZEMZh https://www.luxbaga.de/Burberry-Dress-xT4RWyY4 https://www.luxbaga.de/fendi-charm-flIgH8n8 https://www.luxbaga.de/Dior-earring-GaqLMu0m https://www.luxbaga.de/Louis-Vuitton-M68757-LV-Twist-Multicartes-Wallet-in-Yellow-Epi-leather3981 https://www.luxbaga.de/FENDI-KANI-0FZMhR5N https://www.luxbaga.de/Louis-Vuitton-Epi-Leather-Trim-Petite-Malle-Bag-silvergold3165 https://www.luxbaga.de/Louis-Vuitton-Monogram-Canvas-Elysee-Wallet-M60413-blue4098 https://www.luxbaga.de/Prada-Nylon-Shoulder-Bag-fjAkQ8bY https://www.luxbaga.de/Louis-Vuitton-M61719-Cherrywood-Wallet-Patent-Leather-With-Monogram-canvas-Red3586 https://www.luxbaga.de/celine-Bucket-Bag-zmxgUAH2 https://www.luxbaga.de/Louis-Vuitton-M44736-LV-Speedy-Bandouliere-25-Bags-Beige-Monogram-Empreinte-Leather2754 https://www.luxbaga.de/YSL-Sunset-bag-i4fhMU63 https://www.luxbaga.de/Hermes-Birkin-30-Th3O25Eu https://www.luxbaga.de/YSL-WALLET-uM3aozC4 https://www.luxbaga.de/Balenciaga-Camera-bag-0rx6l5yK https://www.luxbaga.de/Louis-Vuitton-Catogram-Monogram-Canvas-Zippy-Wallet-M63875-2018537 https://www.luxbaga.de/Louis-Vuitton-Sarah-Wallet-M62985-Noir-Epi-leather4382 https://www.luxbaga.de/Fendi-Backpack-ZnWyD2DV https://www.luxbaga.de/Louis-Vuitton-Monogram-Canvas-Surene-BB-Bag-M43776-Cerise-2018864 https://www.luxbaga.de/Louis-Vuitton-City-Steamer-MM-Tote-Bag-M53014-Rubis1217 https://www.luxbaga.de/Louis-Vuitton-M60531-LV-sarah-wallet-monogram-Canvas-With-Leather3508 https://www.luxbaga.de/Louis-Vuitton-Soft-Trunk-Messenger-Bag-M53964-Black-Mesh-20191404 https://www.luxbaga.de/Louis-Vuitton-Patent-Leather-Venice-Bag-M53546-Vert-Bronze-20182986 https://www.luxbaga.de/Louis-Vuitton-N41578-Damier-Azur-Canvas-Sperone-Backpack1483 https://www.luxbaga.de/Louis-Vuitton-Love-Lock-Monogram-Canvas-Sarah-Wallet-M64117-2019623 https://www.luxbaga.de/Michael-Kors-Cindy-Large-Dome-Crossbody-Bag-Red430 https://www.luxbaga.de/Louis-Vuitton-M63956-New-Wave-Chain-Pochette-Bags-Red1162 https://www.luxbaga.de/Burberry-Pocket-XKfCWrZg https://www.luxbaga.de/Louis-Vuitton-Taurillon-Leather-Mini-Dauphine-Bag-M53806-PurpleWhite-20191397 https://www.luxbaga.de/Michael-Kors-Voyager-Large-Logo-Top-Zip-Tote-Brown134 https://www.luxbaga.de/Louis-Vuitton-Monogram-Empreinte-Artsy-MM-M41066-purple3123 https://www.luxbaga.de/Dior-Shoes-t3pY00L7 https://www.luxbaga.de/Louis-Vuitton-M50280-Epi-Leather-Twist-MM-Bags-White2058 https://www.luxbaga.de/YSL-COLLEGE-SMALL-IT0CM4cT https://www.luxbaga.de/Louis-Vuitton-Love-Lock-Monogram-Canvas-Sarah-Wallet-M64117-2019623 https://www.luxbaga.de/Valentino-shoulder-bag-vq0RSZu2 https://www.luxbaga.de/Louis-Vuitton-M43394-Monogram-Empreinte-Saint-Sulpice-PM-Bag-Black2691 https://www.luxbaga.de/Louis-Vuitton-M0342V-LV-Initiales-40mm-reversible-belt-in-Antarctica-SilverBlack-Damier-Graphite-canvas-With-Gold-Buckle4721 https://www.luxbaga.de/Hermès-constance-HJu3ok6Y https://www.luxbaga.de/Burberry-Jacket-hZLNAvPQ https://www.luxbaga.de/Louis-Vuitton-Monogram-Canvas-Onthego-Tote-Bag-M44570-green-2019328 https://www.luxbaga.de/Louis-Vuitton-Isaac-Mizrahi-Clear-Transparent-Tote-Bag-2019611 https://www.luxbaga.de/Burberry-D-ring-Bag-Ag8zSKfp https://www.luxbaga.de/Hermes-Kelly-28-wqQvHeIh https://www.luxbaga.de/Louis-Vuitton-Graceful-Hobo-PM-Bag-Monogram-Canvas-M43701-Beige-2018603 https://www.luxbaga.de/Louis-Vuitton-Monogram-Canvas-Pallas-BB-bag-M41241-Cherry(742201)780 https://www.luxbaga.de/PRADA-Fabric-handbag-P5nNzeGx https://www.luxbaga.de/Michael-Kors-Mercer-Leather-Tote-White116 https://www.luxbaga.de/Hermes-Birkin-25-bTjjK5PE https://www.luxbaga.de/YSL-Boots-qjhvYvKd https://www.luxbaga.de/Burberry-Crossbody-Bag-GdsILGhH